Civilization101Blueprint

Raised granary

Keep a year of grain dry, cool and away from rodents — the single highest-return building on the site.

Build Tier 1 · Neolithic Shelter Moderate 12–18 person-days Crew 3–4

Home: Storage and farm buildings, Level 1 · Foothold, level 1 of 3 in its track. Serves 3 steps across 2 subjects.

Every build on this site has hazards that injure or kill — quicklime, carbon monoxide, molten metal, collapsing ground. Read the safety notice before starting, and read this build's own failure modes below.

Sundanese rice granaries on capped posts. Seed held back is next year's food. Leuit os 080815-2283 srna · 2008-08-14 · Wibowo Djatmiko (Wie146) · CC BY-SA 3.0 · Commons ↗

What it is and why this shape

Growing the grain is the hard part; losing it afterwards is the common part. Post-harvest losses in unprotected traditional storage routinely run 10–30%, and in a bad year the loss is total. A granary is not a shed — every dimension on it is doing a specific job.

Four enemies, and the building answers each one geometrically rather than chemically, because you will not have chemicals:

  • Rodents — defeated by height, by a smooth barrier they cannot climb past, and by clear air around the building. Not by cats and not by hope.
  • Damp — defeated by raising the floor clear of ground moisture, by ventilating beneath it, and by a roof with a generous overhang.
  • Insects — defeated by getting the grain dry and cold before it goes in, and by admixture or sealing.
  • Fire — defeated by siting, which costs nothing and is usually neglected.

The design below is a raised timber granary sized for a small settlement. It uses no metal fasteners except the rat guards, which are the one component genuinely worth spending scarce sheet metal on.

Cross-section Fig 1
Earth / subsoilMasonry / brickTimberMetalLoose fill / grainVoid / air
All dimensions to the outside of framing. The three that matter most are the 0.75 m floor height, the 0.6 m rat guard and the 0.4 m roof overhang — those are the rodent and damp defences, and they are the ones most often shaved down during building.
Floor framing plan Fig 2
TimberMetal
Joists span the short direction so no joist works harder than it must. Posts sit under the bearers at the third points, never under mid-span. The door is on the gable end, downwind of the prevailing weather.
Rat guard — detail at post head Fig 3
Earth / subsoilMasonry / brickTimberMetal
Rats climb timber easily and jump further than people expect. The guard works only if it is smooth, wide enough, gap-free at the post, and if there is nothing within about a metre to jump from. All four conditions, or none of them.

Keyed parts

1Roof, gable, 30–40° pitchThatch, shingle or tile. Pitch must shed water fast; the overhang is what keeps the walls dry.
2Eaves vent gap, ~100 mm continuousThe building must breathe or it will sweat. Screen with woven mesh, fine cloth or split cane against birds and insects.
3Wall, boarded or wattle-and-daubCarries the lateral thrust of the grain, which is substantial. Boards run horizontally so the studs take the load in bending.
4Maximum fill line, 0.3 m below wall topFreeboard. Filling to the top blocks the vent gap and puts thrust on the wall plate rather than the studs.
5Floor deck, 40–50 mm boardsTight-laid. A gap that passes a grain of wheat will pass most of your grain over a winter.
6Joists at 0.6 m centresSpan the short direction. Grain is heavy — roughly 780 kg/m³ for wheat — and the floor carries all of it.
7Post, 150 mm square, 6 offSet on stone pads, not buried. A buried post rots at the ground line and is the usual reason these buildings fail.
8Rat guard, 0.6 m smooth disc or coneThe one part that must be metal or fired ceramic. Smooth, unclimbable, with no gap at the post.
9Discharge hatch and chuteLow, so the bin empties by gravity and nobody has to climb inside. See the failure notes on entering a bin.
10Loading hatchIn the roof slope or gable, above the fill line, with a positive catch against wind and birds.

Specifications

Capacity4.3 m³≈ 3.3 t wheat at 780 kg/m³; ≈ 3.1 t maize; ≈ 2.5 t paddy rice
External plan2.40 × 1.80 mInternal 2.25 × 1.65 m
Wall height1.50 mFill to 1.15 m — the top 0.3 m is freeboard, not storage
Floor height above ground0.75 m min0.90 m is better where rats are established
Rat guard diameter0.60 m minSmooth metal or glazed ceramic. This is not the place to economise
Roof overhang0.40 m minAll four sides. Keeps rain off the walls and off the vent gap
Roof pitch30–40°Steeper for thatch, shallower for tile
Eaves vent gap~100 mm continuousScreened. Ventilation is not optional in a grain store
Floor loading~9 kPa1.15 m of wheat. Size joists for this, not for people walking
Grain moisture at filling≤ 13% wet basis≤ 12% for oilseeds. The single most important number on this page
Clear zone around building1.0 mNothing stored, stacked or growing within it

Bill of materials

MaterialQuantityNotes and substitutes
Posts, 150 × 150 mm6 × 1.1 mDurable heartwood — oak, chestnut, cedar, locust. Charring the buried-height portion helps even though it is not buried.
Stone pads6Flat, bedded level. Replaces the buried post that would otherwise rot out.
Bearers, 100 × 150 mm2 × 2.6 mAcross the posts, the long way.
Joists, 75 × 150 mm5 × 1.9 mAt 0.60 m centres, spanning the short direction.
Floor boards, 40–50 mm≈ 4.5 m²Tight-laid, tongued or rebated if you can. Gaps lose grain continuously and invisibly.
Wall studs, 75 × 75 mm≈ 14 × 1.6 mAt 0.60 m centres. These carry the grain's sideways push.
Wall boards, 25 mm≈ 14 m²Run horizontally. Wattle-and-daub also works if lined smooth inside.
Rafters, 75 × 100 mm10 × 1.6 mPitched 30–40°.
Roof covering≈ 8 m²Thatch, shingles or tile. Thatch is free and burns; site accordingly.
Rat guards6 × 0.6 m diaSheet metal, beaten flat and smooth. Substitute: glazed pottery discs, or an inverted fired-clay bowl. Rough or dented metal is climbable.
Vent screen≈ 9 m runWoven mesh, fine cloth or split cane against birds and large insects.
Pegs / trenails≈ 60Dry hardwood, driven into slightly undersized holes.

Tools: Axe and adze · Saw · Auger or brace and bit · Chisel and mallet · Steel square or a 3-4-5 triangle · Plumb line · Water level

Construction

Site it before you cut anything

On the highest ground you can reasonably use, with natural drainage away on all sides. Well clear of the dwelling, the workshop and any fire, and upwind of them if the roof is thatch. Away from overhanging trees — branches are rat bridges and a fire risk. If you can, orient the long axis across the prevailing wind so the gable ends take the weather.
✓ Check: Stand on the site after heavy rain. If water lies anywhere within 2 m, move it.

Set the pads and level them

Six stone pads, bedded on compacted ground, at the post positions in the plan. Level them to one another with a water level — a length of tube filled with water gives you a true datum over any distance for nothing, and there is no substitute for it here.
✓ Check: All six pad tops within ±5 mm of one datum. Out-of-level here twists every joint above.

Stand the posts and fit the rat guards

Posts stand on the pads, never in the ground. Brace them plumb temporarily. Fit each rat guard before the bearers go on, because afterwards you cannot slide it down the post. The guard must sit tight to the post with no gap — a rat needs very little.
✓ Check: Every post plumb in both directions; every guard tight to the post and smooth on its upper face.

Bearers, then joists

Bearers across the post heads, housed into the tops so they cannot slide. Joists over the bearers at 0.60 m centres, spanning the 1.80 m direction. Check the frame for square by measuring both diagonals — they must be equal.
✓ Check: Diagonals equal within 5 mm. A frame out of square will not take a rectangular floor or a rectangular roof.

Lay the floor tight

Tight-laid boards, cramped up hard. Any gap that will pass a grain will pass a great deal of grain over a season, and you will not notice until the store is short. If your boards are green they will shrink — either season them first or lay them and re-cramp after the first dry season.
✓ Check: Sweep a handful of grain across the deck. Nothing should disappear between boards.

Frame and board the walls

Studs at 0.60 m centres, boards horizontal. Grain pushes sideways with real force — a metre of wheat exerts roughly 3 kPa against the wall, and the wall is a retaining structure, not a weather screen. Line the inside smooth so grain flows down rather than lodging in ledges where insects breed.
✓ Check: Push hard against the middle of a wall panel. Any visible flex means studs too far apart or boards too thin.

Leave the vent gap, then roof it

Stop the wall boards ~100 mm below the wall plate to leave a continuous vent gap, and screen it. Then rafters, then covering, with at least 0.40 m of overhang on every side. The overhang is what keeps rain out of the vent gap you just made.
✓ Check: Look up from inside on a bright day: you should see a continuous line of light at the eaves, and no daylight at all through the roof.

Fit hatches and a discharge chute

A loading hatch high in the gable or roof slope, above the fill line, with a positive catch. A discharge hatch low on one wall with a chute, so the bin empties by gravity into a sack. Design it so nobody ever has to get inside — see the failure notes.
✓ Check: Fill with chaff and discharge the lot without a person entering.

Dry the grain before it goes in

This is the step that decides whether everything above was worth building. Grain must be at or below 13% moisture before it is binned. Without a meter, use the field tests: a grain should shatter rather than squash when struck; a handful should not clump; bitten, it should crack cleanly rather than dent. Dry on racks or mats in sun and moving air, and bring it in before evening damp.
✓ Check: Seal a sample in a glass jar in the sun for an hour. Condensation on the inside means it is too wet — dry it further.

Fill, seal and start a log

Fill to the marked line and no further. Record the date, the weight or volume in, the variety, and the moisture assessment. Then check monthly: push a hand or a probe deep into the bulk and feel for warmth, which is the first sign of trouble and arrives well before smell or visible mould.
✓ Check: One month after filling, the grain at depth is the same temperature as the grain at the surface.

Tolerances that matter

DimensionTargetWhy it matters
Pad levels±5 mmEverything above inherits the error, and a twisted frame will not take a square roof.
Frame diagonalsequal within 5 mmOut of square means the floor, walls and roof all need individual fitting.
Floor board gaps0 — tightA 2 mm gap over 4 m of joint will lose a surprising quantity of grain silently.
Rat guard to postno visible gapThe guard is a single-purpose part. A gap defeats it completely and the building looks finished either way.
Grain moisture≤ 13% w.b.Above ~14% moulds establish; above ~15% the bulk heats and can be lost entirely.
Vent gapcontinuous, ≥ 80 mmBlocked ventilation causes condensation on the underside of the roof, which drips back into the grain.

How this fails

Posts set into the ground. They rot at the ground line — the wettest, most aerated point — and the building sags into itself in five to fifteen years. Stand them on stone.
Filling with damp grain. The commonest total loss. Moulds establish above ~14% moisture, the bulk heats, and a heating bin can be beyond saving within weeks. Nothing about the building can fix grain that went in wet.
Rat guards fitted after the bearers. They cannot be slid down past a fitted bearer, so they get left off or cut and patched — and a patched guard has a gap, and a gap is the same as no guard.
Anything stacked against or under the building. Firewood, a ladder, a barrel, a growing shrub. All of them are ramps that make the height and the guards irrelevant.
Entering a bin of grain. Grain behaves as a fluid: a person sinks, and above roughly waist depth cannot self-extract, and above chest depth the pressure prevents breathing. This kills people every year in modern agriculture with rescue services available. Design for gravity discharge and make it a standing rule that nobody enters a bin with grain in it.
No monitoring. A bin is not a set-and-forget object. Warmth at depth is the early warning, and it precedes smell and visible mould by weeks.

How you know it worked

VerificationA full bin has come through a complete wet season with no warm spots, no mould, no rodent droppings on the floor and no measurable loss between the recorded fill weight and the recorded discharge weight.

Scaling and variants

Smaller: a single-post version at roughly 1.2 × 1.2 m holds about 1 m³ (≈ 780 kg) and needs one guard rather than six — sensible per-household, and it distributes risk, which matters more than efficiency.

Larger: do not simply scale the walls up. Lateral pressure rises with depth, so a deep bin needs horizontal ties or hoops, and above about 2 m of fill depth the wall becomes a serious structural problem rather than a carpentry one. Build more bins instead of bigger ones — separate bins also mean one spoiled bin is not the whole harvest.

Where rats are severe: raise the floor to 0.9 m, use 0.75 m guards, and set the posts in the middle of an open, swept, hard-surfaced area with nothing within 1.5 m.

Hermetic variant: where insects rather than rodents dominate, a sealed container — a lined pit, a rendered clay bin, or sealed drums — kills insects by oxygen depletion within a few weeks and needs no insecticide at all. It requires genuinely dry grain and a genuinely airtight seal, and it cannot be opened and resealed repeatedly.

The same thing, built

A raised timber granary in Bavaria — floor lifted clear of the ground, walls left to breathe. Eberfing - Ettinger Str - Getreidekasten Bichlmoarhof v NO 230723 · 2023-07-23 11:14:22 · Flodur63 · CC BY-SA 4.0 · Commons ↗