High tunnel (hoop house)

Steel bows on ground posts under one layer of greenhouse film, with sides that roll up: weeks added to both ends of the season, in the field's own soil.

Build Tier 5 · Second industrial revolution Food Moderate — the layout must be square, and the film needs a calm day and a crew Several days with a kit, after preparing the ground the season before Crew 2–3 to raise the bows; more to pull the film

Home: Protected growing, Level 5 · Current, level 2 of 3 in its track. Serves 1 step.

Every build on this site has hazards that injure or kill — quicklime, carbon monoxide, molten metal, collapsing ground. Read the safety notice before starting, and read this build's own failure modes below.

A high tunnel before its film goes on: steel bows set on ground posts and tied along their length by purlins. High tunnel construction · 2012-10-26 04:45 · NRCS photo by Michelle Banks · Public domain · Commons ↗

What it is and why this shape

A high tunnel is the cheapest way to put a roof over growing ground: no heater, no fans, no concrete, and the crop grows in the soil. It shelters the crop from rain, wind and frost and holds the day's warmth, adding weeks at both ends of the season. Its weak points are wind and snow, which is why most of the work below is anchoring and bracing. Sizes and methods are from the Noble Foundation, the University of Nebraska and the University of Vermont.

High tunnel, 6.1 m wide: end elevation Fig 1
Earth / subsoilTimberMetalGlass
Gothic bows 3.4 m high on ground posts driven 0.6 m; baseboard and hip-board at 1.5 m each side; roll-up side raised on the left, down on the right; ridge purlin and two side purlins; end wall with a 1.8 m double door.
High tunnel, 14.4 m long: side elevation Fig 2
Earth / subsoilTimberGlass
13 bows 1.2 m apart; film on the roof down to the hip-board; the roll-up side wound up; diagonal braces at every corner; winter props (dashed) under the ridge purlin at every other bow.

Keyed parts

1Ground postsSteel tube 0.75–1.0 m long, one wider than the bow it takes, driven at least 60 cm; longer in sand.
2BowsGalvanised steel tube, 42–48 mm across, bent to a pointed gothic arch, 1.2 m apart: 13 bows.
3PurlinsTube along the underside of the bows: one at the ridge and one down each side.
4Baseboard10–15 cm high along each side on pipe hangers; closes the bottom and lands the roll-up side.
5Hip-boardAlong each side at 1.5 m; carries the roof film and the top of the roll-up side.
6Film and channelOne sheet of 150 µm (6 mil) UV-stabilised greenhouse film, held in aluminium channel by spring wire.
7Roll-up sideA strip of film fixed at the hip-board, its lower edge wound on a pipe turned by a crank.
8Corner bracesDiagonal tube from each end bow to the baseboard, at all four corners.
9End wall and doorTimber or steel frame tied to the end bow, with a double door 1.8 m wide.
10Snow propsPosts under the ridge purlin at every other bow, in winter only.

Specifications

Size6.1 × 14.4 mCommercial tunnels are 6–9 m wide and any length.
Height3.4 m at the peak1.5 m at the hip-board.
Bows13, 1.2 m apartGalvanised tube, 42–48 mm outside (1.66–1.90 in).
Ground postsdriven 60 cm or more0.75–1.0 m long; longer in sandy soil.
Film150 µm, UV-stabilisedRoof: one sheet about 8.0 m wide, 3 m longer than the house.
Roll-up sides1.35 m openingFrom the baseboard to the hip-board; a hip at 1.8 m gives more air.
Roof at the peak30°Steeper than 6:12 (26.6°), so snow slides.

Bill of materials

MaterialQuantityNotes and substitutes
Ground posts, steel tube26 × 0.75–1.0 mTwo per bow; each slightly wider than the bow tube.
Bows, galvanised steel tube 42–48 mm13Bent to the gothic profile; about 10.3 m of tube each, from post to post.
Purlins, the same tube or lighter3 × 14.4 mJoined with swaged ends; fixed with cross-connectors.
Baseboards and hip-boards4 × 14.4 mTreated timber, 25–50 × 150 mm, or steel tube; pipe hangers and self-drilling screws.
Corner braces4Tube, about 2.8 m, with clamps at each end.
Greenhouse film, 150 µm, UV-stabilised8.0 × 17.5 mThe roof sheet; plus two side strips 1.8 × 14.4 m and pieces for the end walls. Anti-drip and IR grades cost more and hold more heat and light.
Aluminium channel and spring wireabout 49 mAlong both hip-boards and round both end bows.
Roll-up pipes and cranks2One per side, the length of the house.
End walls2Timber frame, double doors 1.8 × 2.1 m, film or twin-wall polycarbonate.
Straps and ground anchors7Over every other bow, to cables through eye-bolts at the ground posts.

Tools: Post driver · String lines and stakes · Tape measure · Spirit level and a laser or water level · Drill and driver · Pipe cutter and wrenches · Two step-ladders · Chalk line

Construction

Prepare the ground a season ahead

Choose full sun and ground that drains, near water. Build a pad a little above the surrounding ground, falling 1–2 %, with the narrow end toward the prevailing wind (University of Nebraska). Work compost into the top 15–20 cm of the soil now; once the tunnel is up the ground is harder to reach.

Set out a square rectangle

Stake the four corners at 6.1 × 14.4 m and run string lines at the height the post tops will stand. Square the corners with a 3-4-5 triangle and check that the diagonals are equal, as in setting out a block. Mark the tops of the corner stakes so the strings can be reset.

Drive the ground posts

Drive a post at every bow position, 1.2 m apart down both sides, on the outside of the string line, to at least 60 cm; longer posts in sandy soil (Noble Foundation). Use a spacing template, keep each post plumb, and bring all their tops to the string.

Stand the bows and end walls

Set each bow into its pair of posts and bolt it. Frame the end walls with posts set 60 cm into the ground, tamped or in concrete, and tie them to the end bows; put a door header at 2.1 m.

Fix the purlins, baseboards and hip-boards

Fix the ridge purlin and a side purlin down each side, on the underside of the bows, with cross-connectors. Snap a chalk line along each side and fix the baseboard (10–15 cm high) and the hip-board (at 1.5 m) to the posts and bows with pipe hangers.

Brace every corner

Fit a diagonal brace from each end bow down to the baseboard, at all four corners, and link each end bow to the next bows with pipe bracing (University of Nebraska; Noble Foundation). An unbraced tunnel racks sideways in wind.

Fit the channel and pull the film

Screw aluminium channel along both hip-boards and around both end bows. Wait for a calm morning. Unroll the roof sheet along one side, then pull it over the bows with a crew on both sides and on ladders, never letting the wind get under it. Fasten it in the channel with spring wire, starting at the middle of each side and working out, pulling it taut as you go.

Hang the roll-up sides

Fix a strip of film along each hip-board, wind its lower edge onto a pipe fitted with a crank, and let it rest on the baseboard when down. Where the sides meet the end walls, leave a fixed strip of film at least 45 cm wide so they overlap (University of Nebraska).

Close the end walls

Cover the end walls with film or twin-wall polycarbonate, which lasts 10 years or more, and hang the doors. Keep them shut in wind.

Prepare for wind and snow

Strap over every other bow to cables through eye-bolts at the ground posts. Before the first snow, put props under the ridge purlin at every other bow, and plan to clear snow early and evenly from both sides (Noble Foundation; University of Vermont). Do not keep a crop from frost with a ventless heater: it fills the closed tunnel with carbon monoxide and ethylene (Cornell e-GRO).

Tolerances that matter

DimensionTargetWhy it matters
Bow spacing1.2 m on centre, from a templateUneven spacing leaves slack film between bows, which flaps and tears.
Ground postsat least 60 cm deep, plumb, tops levelShallow posts pull out in wind; uneven tops twist the bows.
DiagonalsequalAn out-of-square frame will not take the film evenly.
Filmtaut, no flapping edgeFlapping film wears through at the bows in one windy season.
Drains45–60 cm clear of ground postsDigging nearer loosens the soil that holds the posts down (University of Vermont).

How this fails

Film pulled on a windy day. The sheet becomes a sail. Wait for calm.
Posts too shallow, or in sand, pulled out by the first gale.
No corner braces. The frame racks sideways and the film splits.
Snow left to build up on an unheated tunnel until the bows buckle.
Roll-up sides left open in a storm, or flapping loose: the wind gets inside and lifts the house.
A ventless propane or paraffin heater run overnight for frost protection: carbon monoxide for the grower, ethylene for the crop.

How you know it worked

VerificationThe diagonals are equal, every bow sits 1.2 m from the next, the film is taut with no flapping edge, both roll-up sides wind fully up and down, and the tunnel has come through its first gale and its first snow without damage.

Scaling and variants

Longer: add bows at 1.2 m; tunnels 14.6, 29.3 or 43.9 m long use standard 30.5 or 45.7 m rolls of film (University of Nebraska). Wider: 9 m tunnels take heavier bows and more purlins. Warmer in winter: a second layer of film, held apart by a small inflation fan, cuts the heat lost through the cover by a quarter to a third (FAO: U of 6.0–8.0 W/m²K for one layer, 4.2–6.0 for two) and helps shed snow (University of Vermont). A multi-span house joins tunnels at their gutters.

The same thing, built

Pulling one sheet of greenhouse film over a high tunnel: a crew along both sides and on ladders, on a calm day. Covering a high tunnel, Waterloo, Iowa · 2022-08-16 · USDAgov · Public domain · Commons ↗
A gothic-arch high tunnel part-built: the end wall clad in film, the steel bows and purlins still bare. High tunnel, D-Town Farm, Detroit · 2011-09-24 · Michael Barera · CC BY-SA 4.0 · Commons ↗