High tunnel (hoop house)
Steel bows on ground posts under one layer of greenhouse film, with sides that roll up: weeks added to both ends of the season, in the field's own soil.
Home: Protected growing, Level 5 · Current, level 2 of 3 in its track. Serves 1 step.
Every build on this site has hazards that injure or kill — quicklime, carbon monoxide, molten metal, collapsing ground. Read the safety notice before starting, and read this build's own failure modes below.
What it is and why this shape
A high tunnel is the cheapest way to put a roof over growing ground: no heater, no fans, no concrete, and the crop grows in the soil. It shelters the crop from rain, wind and frost and holds the day's warmth, adding weeks at both ends of the season. Its weak points are wind and snow, which is why most of the work below is anchoring and bracing. Sizes and methods are from the Noble Foundation, the University of Nebraska and the University of Vermont.
Keyed parts
| 1 | Ground posts | Steel tube 0.75–1.0 m long, one wider than the bow it takes, driven at least 60 cm; longer in sand. |
| 2 | Bows | Galvanised steel tube, 42–48 mm across, bent to a pointed gothic arch, 1.2 m apart: 13 bows. |
| 3 | Purlins | Tube along the underside of the bows: one at the ridge and one down each side. |
| 4 | Baseboard | 10–15 cm high along each side on pipe hangers; closes the bottom and lands the roll-up side. |
| 5 | Hip-board | Along each side at 1.5 m; carries the roof film and the top of the roll-up side. |
| 6 | Film and channel | One sheet of 150 µm (6 mil) UV-stabilised greenhouse film, held in aluminium channel by spring wire. |
| 7 | Roll-up side | A strip of film fixed at the hip-board, its lower edge wound on a pipe turned by a crank. |
| 8 | Corner braces | Diagonal tube from each end bow to the baseboard, at all four corners. |
| 9 | End wall and door | Timber or steel frame tied to the end bow, with a double door 1.8 m wide. |
| 10 | Snow props | Posts under the ridge purlin at every other bow, in winter only. |
Specifications
| Size | 6.1 × 14.4 m | Commercial tunnels are 6–9 m wide and any length. |
| Height | 3.4 m at the peak | 1.5 m at the hip-board. |
| Bows | 13, 1.2 m apart | Galvanised tube, 42–48 mm outside (1.66–1.90 in). |
| Ground posts | driven 60 cm or more | 0.75–1.0 m long; longer in sandy soil. |
| Film | 150 µm, UV-stabilised | Roof: one sheet about 8.0 m wide, 3 m longer than the house. |
| Roll-up sides | 1.35 m opening | From the baseboard to the hip-board; a hip at 1.8 m gives more air. |
| Roof at the peak | 30° | Steeper than 6:12 (26.6°), so snow slides. |
Bill of materials
| Material | Quantity | Notes and substitutes |
|---|---|---|
| Ground posts, steel tube | 26 × 0.75–1.0 m | Two per bow; each slightly wider than the bow tube. |
| Bows, galvanised steel tube 42–48 mm | 13 | Bent to the gothic profile; about 10.3 m of tube each, from post to post. |
| Purlins, the same tube or lighter | 3 × 14.4 m | Joined with swaged ends; fixed with cross-connectors. |
| Baseboards and hip-boards | 4 × 14.4 m | Treated timber, 25–50 × 150 mm, or steel tube; pipe hangers and self-drilling screws. |
| Corner braces | 4 | Tube, about 2.8 m, with clamps at each end. |
| Greenhouse film, 150 µm, UV-stabilised | 8.0 × 17.5 m | The roof sheet; plus two side strips 1.8 × 14.4 m and pieces for the end walls. Anti-drip and IR grades cost more and hold more heat and light. |
| Aluminium channel and spring wire | about 49 m | Along both hip-boards and round both end bows. |
| Roll-up pipes and cranks | 2 | One per side, the length of the house. |
| End walls | 2 | Timber frame, double doors 1.8 × 2.1 m, film or twin-wall polycarbonate. |
| Straps and ground anchors | 7 | Over every other bow, to cables through eye-bolts at the ground posts. |
Tools: Post driver · String lines and stakes · Tape measure · Spirit level and a laser or water level · Drill and driver · Pipe cutter and wrenches · Two step-ladders · Chalk line
Construction
Prepare the ground a season ahead
Set out a square rectangle
Drive the ground posts
Stand the bows and end walls
Fix the purlins, baseboards and hip-boards
Brace every corner
Fit the channel and pull the film
Hang the roll-up sides
Close the end walls
Prepare for wind and snow
Tolerances that matter
| Dimension | Target | Why it matters |
|---|---|---|
| Bow spacing | 1.2 m on centre, from a template | Uneven spacing leaves slack film between bows, which flaps and tears. |
| Ground posts | at least 60 cm deep, plumb, tops level | Shallow posts pull out in wind; uneven tops twist the bows. |
| Diagonals | equal | An out-of-square frame will not take the film evenly. |
| Film | taut, no flapping edge | Flapping film wears through at the bows in one windy season. |
| Drains | 45–60 cm clear of ground posts | Digging nearer loosens the soil that holds the posts down (University of Vermont). |
How this fails
How you know it worked
Scaling and variants
Longer: add bows at 1.2 m; tunnels 14.6, 29.3 or 43.9 m long use standard 30.5 or 45.7 m rolls of film (University of Nebraska). Wider: 9 m tunnels take heavier bows and more purlins. Warmer in winter: a second layer of film, held apart by a small inflation fan, cuts the heat lost through the cover by a quarter to a third (FAO: U of 6.0–8.0 W/m²K for one layer, 4.2–6.0 for two) and helps shed snow (University of Vermont). A multi-span house joins tunnels at their gutters.