Plan the city before it grows

Before the city reaches its fringe, reserve the land it will need for 20–30 years, secure an arterial grid about 1 km apart with its rights-of-way, lay a street hierarchy and utility corridors inside it, and publish the plan.

Tier 5 · Second industrial revolution Settlements t5-city Blocked by prerequisites
La Plata, Argentina, from the air (2019): a planned city whose square grid of blocks and broad avenues was laid out before it was built, with the countryside beyond. La Plata aerial · Taken on 26 September 2019, 17 · Andrzej Otrębski · CC BY-SA 4.0 · Commons ↗

Everything for this step

Field guide
Planning a settlement → 12 sections Earth sciences → 7 sections
Builds
None yet.
Reference sheets
None.
Sciences it rests on
Engineering · Earth sciences

Why this matters

Cities grow faster in area than in people: between 1990 and 2000 urban land cover grew at twice the rate of urban population, and at those rates the world's urban population would double in 43 years while its land cover doubled in 19 (Angel, Making Room for a Planet of Cities, Lincoln Institute, 2011). Growth that arrives before the streets cannot be serviced cheaply afterwards: in Bogotá, correcting an irregular settlement cost 2.7 times as much as planning the area in the first place, and upgrading ran to about US$50–70 per m² against under US$25 to service new land (Smolka, 2003).

The cheapest lasting step is to fix the arterial roads before anyone builds: long, continuous roads spaced no more than about 1 km apart, so public transport is within a 10-minute walk of every home, with rights-of-way wide enough for bus lanes, cycle paths and trunk water and sewer mains.

The shape of it

  1. Project the land the city will need for 20–30 years, and plan at least 50 % more than population and density alone suggest.
  2. Peg an arterial grid no more than 1 km apart over the whole expansion area, connected to the existing roads.
  3. Secure the rights-of-way first: arterials 45–60 m, sub-arterials 30–45 m, collectors 15–30 m, local streets 10–15 m in new areas.
  4. Lay utilities in common ducts under the street, so pipes and cables can be repaired without digging up the road.
  5. Reserve parks, school and clinic sites, and flood land before the plots are sold.
  6. Let landowners give part of their land for streets in return for the right to develop the rest.
  7. Publish the plan with its map, rules and review date, and decide every permit against it.
The arterial grid, pegged before the city arrives Fig 1
Loose fill / grain
Arterials about 1 km apart (rights-of-way 45–60 m), sub-arterials at 500 m (30–45 m), collectors at 250 m (15–30 m); local streets (10–15 m) are laid out later inside each superblock, and parks are reserved before plots are sold. No home is more than about 500 m from an arterial and its buses (Angel, 2011; IRC:SP:118-2018).

Doing it, step by step

The summary above says what has to happen. This says how, with the numbers that decide whether it works.

1 · Project the land the city will need

Plan for 20–30 years of expansion, and plan generously. Angel's global sample of cities (Lincoln Institute, 2011) found that:

  • Built-up densities fell about 2 % a year between 1990 and 2000, and have fallen for a century or more.
  • Urban land cover grew twice as fast as urban population.
  • Most cities in the study expanded their built-up area more than 16-fold in the twentieth century.

Project population and density together, then allow for the open land that a growing city leaves inside its footprint: the areas planned for 20–30 years of expansion should be at least 50 % larger than population and density alone suggest. Draw generous metropolitan limits, not a tight growth boundary.

✓ Check: The plan states its population and density projections, the land they imply, and an expansion area at least 50 % larger.

2 · Peg an arterial grid about 1 km apart

The arterial grid is the frame the rest of the city fills in. Angel gives it five properties:

  1. Total coverage of the whole area designated for 20–30 years of expansion.
  2. Connectivity: long, continuous roads that cross the area and join the existing network.
  3. Spacing of no more than about 1 km, so public transport is within a 10-minute walk of every point.
  4. A wide right-of-way, of the order of 20–30 m or more, for bus lanes, cycle paths, a median and trunk water and sewer mains.
  5. Progressive improvement: acquire only the rights-of-way at first, and build the road in stages as the city reaches it.

Inside each roughly 1 km superblock, local streets can be laid out later, by public or private developers, to reach every plot.

✓ Check: On the plan, no point in the expansion area is more than about 500 m from an arterial, and every arterial joins the existing road network.

3 · Give every street in the hierarchy its right-of-way

Fix the width between property lines before anyone builds; carriageways can be paved later. India's urban roads manual (IRC:SP:118-2018) gives, for new areas:

  • Arterial roads: right-of-way 45–60 m, on a network of about 1,000 × 1,000 m, with room for a future mass-transit line.
  • Sub-arterial roads: 30–45 m, on about 500 × 500 m.
  • Collector streets: 15–30 m, on about 250 × 250 m.
  • Local streets: 10–15 m, at spacings under about 125 m.

Peg each right-of-way on the ground, record it in the land register, and refuse any building that encroaches on it. The planning guide covers the earlier, smaller layouts.

✓ Check: Every street on the plan has a hierarchy class and right-of-way width, and the pegs on the ground match the register.

4 · Put the utilities in corridors under the street

Water, sewers, drains, power and telecoms all follow the streets. Map them, and wherever feasible lay them in common utility ducts: one for city-level utilities (sewers, water, electricity) and another for street-level ones (local storm drains, telecom, street-lighting cables), so each can be repaired without digging up the road or disturbing the others (IRC:SP:118-2018).

Trunk water and sewer mains run under the arterials, sized for the whole expansion area; separate storm drainage and foul sewers as city water and sewerage requires.

✓ Check: A single utility map shows every main, duct and cable in the plan area, and each sits within a street right-of-way.

5 · Reserve the public land before the plots are sold

Once land is built on, it cannot be bought back cheaply. Before plots go on sale, mark and reserve:

  • Parks and playgrounds within walking distance of homes, in a hierarchy from small neighbourhood spaces to large city parks.
  • Sites for schools, clinics, markets and fire stations.
  • Flood land and steep slopes, kept open by zoning.

The historic plans that have lasted — Barcelona's and Manhattan's grids among them — combined a rational layout, a clear line between public and private space, and well-dimensioned streets and blocks (UN-Habitat, Planned City Extensions, 2015).

✓ Check: Every neighbourhood on the plan has reserved open space and service sites, and none of them has been sold or built on.

6 · Assemble the land fairly

The city does not have to buy all the land for its streets. In many countries, from Israel to Ecuador, landowners on the urban fringe may develop their land on condition that they give up part of it for public use, enforced by regulation (Angel, 2011). The arterial grid then raises the value of the land that remains.

Pay for land that must be bought — for arterials crossing a single small holding, for instance — at a published valuation, and record every dedication and purchase in the land register.

✓ Check: Every right-of-way in the plan is either dedicated, purchased or reserved, and the register shows which.

7 · Publish the plan and keep it

A plan nobody can see is not a plan. Display the map, the street classes, the reserved land and the rules in a public place and on the record, with the date it was adopted and the date it will be reviewed.

  • Decide every building permit against it, and publish the decisions.
  • Review the projections against the census and the built-up area at the review date, and extend the grid ahead of the growth.
  • Change the plan only by a published amendment, as zoning requires.
✓ Check: The current plan is on public display with its adoption and review dates, and every permit since adoption cites it.

How this fails

A tight growth boundary drawn to contain the city, so land prices rise and growth jumps over it as informal settlement.
Building allowed before the arterial rights-of-way are secured, so the roads that would have carried buses are lined with houses.
Utilities laid piecemeal by each developer, so the city ends with a tangle of pipes no one can map or repair.
Parks, schools and flood land left unreserved until they are built over.
A master plan kept in an office where nobody can see it, or never reviewed.
Ribbon development along the old highways, while the land between them is never connected.

How you know it worked

VerificationA published map shows the expansion area for the next 20–30 years with every arterial right-of-way pegged and secured no more than about 1 km apart, utility corridors and reserved public land marked, and every permit since the plan was adopted checked against it.