Water power
Get a source of continuous power that is not a muscle.
Everything for this step
- Field guide
- Electricity → 8 sections Energy sources → 14 sections Physics → 12 sections Engineering → 7 sections
- Builds
- Overshot water wheel
- Reference sheets
- 7 sheets in Electricity · 16 sheets in Energy sources
- Sciences it rests on
- Physics · Engineering
- Track
- Mechanical power, level 1 of 2 · next: Wind power
Why this matters
A modest water wheel delivers a few kilowatts, day and night, without eating. That is the work of dozens of people, and it is the first energy surplus large enough to support full-time specialists who make things rather than food.
The shape of it
- Measure head and flow before designing anything. Power is proportional to head times flow. A small stream with good fall beats a large one that is flat.
- Match the wheel to the head: undershot for lots of water and almost no fall; breastshot for moderate; overshot for high head and low flow — overshot is by far the most efficient and worth engineering the leat for.
- Build the water works, not just the wheel: a weir to raise the level, a leat or headrace to carry water along the contour, a sluice to control and shut off flow, a tailrace to take it away. Most of the labour is here, and most of the failures are here too.
- Include a way to stop it. A wheel you cannot disengage cannot be maintained safely, and someone will eventually be caught in it.
- Take the power off with gearing — a pit wheel and lantern pinion — and distribute it with line shafting to several machines at once.
- Put it to work in order of return: grinding grain first (it is the largest continuous labour in the settlement), then sawing timber, then driving the bellows for smelting, then trip hammers for forging, then the machine tools.
- Build for floods. The flood will come and it will be larger than you planned for. Design the weir to be overtopped without destruction and expect to rebuild the race.
Doing it, step by step
The summary above says what has to happen. This says how, with the numbers that decide whether it works.
1 · Measure head and flow before designing anything
Power is proportional to head times flow.
- Head — the vertical fall available: run a clear hose full of water from the intake point to the wheel site, or use a water level, and measure the height difference in steps.
- Flow — for a small stream, time how long it takes to fill a container of known volume at a spout or a temporary dam. For a larger one, measure cross-section area × surface velocity × 0.8 — time a float over a measured 10 m and correct for the slower water near the bed.
Measure flow at the driest time of year. That is the power you can count on.
2 · Calculate the power, and see whether it is worth building
Power (watts) ≈ 9.81 × flow (litres per second) × head (metres) × efficiency.
Efficiency: overshot about 60–75%, breastshot about 45–65%, undershot about 20–30%.
Example: 3 m of head and 100 L/s through an overshot wheel ≈ 9.81 × 100 × 3 × 0.7 ≈ 2 kW — continuously, the work of dozens of people. Half the flow in summer means half the power; a stream that dries up gives nothing. If the number is under a few hundred watts at the dry-season flow, look for a better site before building.
3 · Match the wheel to the head
- Overshot — water enters at the top and fills buckets, turning the wheel by weight. For high head and low flow, and by far the most efficient. The wheel diameter is a little less than the head.
- Breastshot — water enters around axle height. Moderate head.
- Undershot — paddles dipped in the flow. Lots of water and almost no fall, and inefficient.
Run an overshot wheel slowly — a rim speed of about 1–2 m/s — so the buckets fill properly and do not spill. See the overshot wheel.
4 · Build the water works — this is most of the labour
The wheel is the small part. In order:
- Weir — raises the water level at the intake.
- Leat or headrace — carries water along the contour to above the wheel, falling very gently — around 1 in 1,000 to 1 in 2,000 — so it keeps almost all of its head.
- Sluice at the leat entrance and a spillway to return excess water to the stream.
- Penstock gate at the wheel.
- Tailrace — takes water away fast so it does not back up and drown the bottom of the wheel.
Line the leat where it leaks, and inspect it after every storm.
5 · Build the way to stop it before the way to start it
A wheel that cannot be stopped cannot be maintained safely, and someone will eventually be caught in it. Build before the wheel runs:
- A sluice or penstock gate that cuts all flow to the wheel, reachable from outside the wheel pit.
- A brake on the wheel or the first shaft.
- A lock-off — a pin or bar that holds the gate shut while anyone is working on the machinery, with the key held by the person working.
- Guards round every exposed gear and belt.
6 · Gear up and distribute the power
Wheels turn slowly — a few to perhaps 15 revolutions a minute — and millstones want around 100–140. Take power off with a pit wheel and a lantern pinion or a wallower, stepping up in one or two stages.
Cut gear teeth with a dividing plate, never by eye, and use hardwood cogs — apple, hornbeam — designed to break before the wheel does, with spares made ahead. Distribute power with line shafting and belts to several machines. Grease every bearing on a schedule.
7 · Put it to work in order of return
- Grinding grain — the largest continuous labour in the settlement.
- Sawing timber.
- Driving the bellows for smelting — continuous air that people cannot sustain for long.
- Trip hammers for forging.
- Machine tools.
Plus fulling cloth, pumping, and pressing oil. Record hours run and output per day for each use, so the next wheel goes where it pays most.
8 · Build for the flood you have not seen yet
The flood will come and it will be larger than planned. Design the weir to be overtopped without destruction: a stone or timber crest with a protected apron below it, and banks armoured where the water returns. Set the wheel and machinery above the highest flood mark you can find — look for debris lines in trees and ask anyone who has lived there longest.
Close the sluice ahead of a flood, and expect to rebuild part of the leat after a large one. Keep timber and stone for repairs stored above flood level.
Build it
Dimensioned drawings, bills of materials and construction procedures for the things this step asks for.
How this fails
How you know it worked
What this unlocks
What this makes practical
These were already buildable without this step. What this one changes is the cost, the scale, or the safety of them.